Gamble-Stanek Family Room; Day 71 – “Installing the Stall Wall”

101609 (6)

The work site is particularly welcoming today as a cozy fire takes the edge off a chilly autumn morning.  The floor is completely installed, and now covered for protection while the painter gets to work.

101609 (2)

In the kitchen, we get a glimpse of the farmhouse pine floors.  Early next week, the flooring will be sanded and finished with a clear coat.

101609 (8)

Back in the family room, vertical wood paneling is installed on the “stall wall”.  Mike is currently working on a frame to house the wrought iron spindles which will complete the effect, meant to evoke the horse stalls that originally occupied the space.