Gamble-Stanek Family Room; Day 43 – “Back to Labor Day”

After the holiday weekend, it’s back to work time. While plumbing and electric rough-ins wrap up, cedar siding is primed in preparation for installation later this week. At the rear corner of the house, the electrician is trenching a new power supply to the shed.

Initial plumbing and electric inspections are scheduled for tomorrow, with the insulator prepared to follow.

Craig and Gary inspect the new roof job.

The low pitch of the window wells required a membrane roof. In this case, modified bitumen was used. The discoloration shown is the result of torching the membrane to fit corners of the well. A colored finish coat will complete the job. Some siding repair is also needed to provide a finished look to the transition between original exterior wall and the new roof.